SCS installation

Our specialists are certified by the leading world SCS manufacturers.

We have already installed SCS for several thousand work areas in representative offices of numerous customers.

The following factors are important for us at the installation stage:

  • If the target place is under construction we coordinate our works with constructors in order to ensure SCS installation technical requirements;
  • There should be no damage for room interior;
  • In functioning offices time and order of works should be coordinated with the customer’s personnel. The noisiest part of the work (e.g. wall and floor passage) can be done in non-working hours. Upon the customer’s request all the works may be carried out in non-working hours;
  • Clean gloves are used in order not to sally walls and ceilings while ducts and cables are being installed;
  • The installed ducts meet the current standards and are open for further expansion;
  • Patch panels are installed in compliance with the ergonomic standards, so as their functioning to be convenient;
  • All cable system elements are marked according to the flow chart;
  • Cables in troughs, on corbels and ducts are bundled and placed in parallel with the required distance between twisted pair and power cables;
  • Terminating "Twisted pair" cables with outlets and panels, we keep twists unbroken to reduce attenuation;
  • In the completion phase of installation works SCS should be tested with cable analyzers and testers;
  • Installation works are completed with the tiding-up and handing the SCS over to the customer;
  • Guarantee certificates for the installed SCS (for 20-25 years depending on the certain SCS manufacturer) should be received by the company and handed over to the customer.